• 64

「熱、熱、熱」,今日「風力發電」0.28%!


Monica陳 wrote:
那不就結了嗎台電簽...(恕刪)


那是跟據廠商建置成本來估算費率
不是跟廠商攤建置成本
炒什麼炒 wrote:
https://te...(恕刪)


不用怕啦!
廠商算個鳥!
台灣電價由經濟部公告就好,
今年公告0元就0元!
明年還公告廠商必需倒貼5元咧!
英國政府哪能跟台灣經濟部比,
爛死了!
還要提高收購價吸引廠商!?
英國政府~~我呸!
炒什麼炒 wrote:
那是跟據廠商建置成...(恕刪)


所以可證費率就已經含括了建置成本
不然就不用考慮建置成本來決定費率



魯拉拉拉 wrote:
那個stunmaker...(恕刪)


彰化離岸風場量測(年均容量因數40%)

https://www.mdpi.com/1996-1073/12/4/700/pdf





英國離岸風場量測(年均容量因數30%)

https://www.eci.ox.ac.uk/publications/downloads/sinden06-windresource.pdf




歐洲各國離岸風場量測


https://windeurope.org/wp-content/uploads/files/about-wind/statistics/WindEurope-Annual-Offshore-Statistics-2017.pdf


炒什麼炒 wrote:
彰化離岸風場量測https...(恕刪)


好可憐
台灣最熱最需要電的6,7,8月
風電發電量最低
8月還只有10%

所以要這種東西幹什麼?
魯拉拉拉 wrote:
台電倒了,大概台灣也垮了

Ørsted is listed at the Copenhagen Stock Exchange.
Danish Government holds the majority of Ørsted shares (50.1%).

魯拉拉拉 wrote:
如果沃旭出了問題,八大行的貸款收不回來,就由你stunmaker來償還如何?(恕刪)



沃旭能源於 2016 年 6 月納斯達克哥本哈根證交所掛牌上市,也是歐洲當年度最大的公開發行上市案(IPO)。沃旭擁有健全的資產負債表與 BBB + / Baa1 的投資級評等,且丹麥政府持股 50.1%,顯示沃旭有堅強的財務能力在台灣開發、建造、持有、運維世界級的離岸風場。
Tim_Liu0717 wrote:
你什麼時候去叫經濟部公告
[風電0元]?
甚至[用風電倒貼5元]?
反正經濟部公告就好,
廠商只能承受

到底講幾次你才會懂??
躉購價格由經濟部決定,

但是廠商有權不簽PPA,廠商有權不簽PPA,廠商有權不簽PPA.

經濟部如果公布2020年躉購價0元,你看誰會簽PPA!!
你連審定會的功能都搞不清楚!!
Tim_Liu0717 wrote:
0元風電的證據在哪?
拿出來我看看~

請你拿出風電不發電也要電費的證據!!

Monica陳 wrote:
好可憐
台灣最熱最需要電的6,7,8月
風電發電量最低
8月還只有10%

所以要這種東西幹什麼?(恕刪)



日本跟核四同一型的反應爐(ABWR)的運轉效率




https://en.wikipedia.org/wiki/Advanced_boiling_water_reactor#Japan_and_Taiwan

In comparison with comparable designs, the four ABWRs in operation are often shut down due to technical problems.[18] The International Atomic Energy Agency documents this with the 'operating factor' (the time with electricity feed-in relative to the total time since commercial operation start). The first two plants in Kashiwazaki-Kariwa (block 6 & 7) reach total life operating factors of 70%, meaning that about 30% of the time, since commissioning, they were not producing electricity.[19][20] For example, in 2010 Kashiwazaki-Kariwa 6 had an operating capacity of 80.9%, and an operating capacity of 93% in 2011.[21] However, in 2008 it did not produce any power as the installation was offline for maintenance, and therefore had an operating capacity of 0% for that year.[21] In contrast other modern nuclear power plants like the Korean OPR-1000 or the German Konvoi show operating factors of about 90%.[22]

The output power of the two new ABWRs at the Hamaoka and Shika power plant had to be lowered because of technical problems in the power plants steam turbine section.[23] After throttling both power plants down, they still have a heightened downtime and show a lifetime operating factor under 50%.[24][25]
  • 64
內文搜尋
X
評分
評分
複製連結
請輸入您要前往的頁數(1 ~ 64)
Mobile01提醒您
您目前瀏覽的是行動版網頁
是否切換到電腦版網頁呢?