哥偶然從外網找到這份材料 文章中說

Key Points and Summary on Ford-Class Carrier – The U.S. Navy’s new aircraft carrier, the USS John F. Kennedy (CVN-79), is facing a massive new delay, with its delivery now pushed back nearly two years to March 2027.
-According to new budget documents, the delay is necessary to complete work on the ship’s troubled Advanced Arresting Gear (AAG) and Advanced Weapons Elevators (AWE)—the same systems that plagued the lead ship, the USS Gerald R. Ford.
-This setback is part of a broader crisis in the American shipbuilding industry, with the Navy Secretary admitting that “all of our programs are a mess.”
關於福特級航空母艦的關鍵資訊和總結——美國海軍新型航空母艦「約翰•F•甘迺迪」號(CVN-79)面臨新的重大延誤,交付時間已推遲近兩年,延至2027年3月- 根據最新的預算文件,這次延誤是為了完成該艦問題重重的先進阻攔裝置(AAG)和先進武器升降機(AWE)的維修工作——這些系統也曾困擾著首艦“杰拉爾德•R•福特”號。
- 此次延誤是美國造船業整體危機的一部分,海軍部長承認「我們所有的項目都一團糟」。

The Ford-Class Problems Keep Stacking Up
福特級航母的問題層出不窮

Recently-released United States Navy budgetary documents reveal that the United States’ newest aircraft carrier, the USS John F. Kennedy, is significantly behind schedule.
近期公佈的美國海軍預算文件顯示,美國最新型航空母艦「約翰•F•甘迺迪號」的建造進度嚴重落後。
Buried within the massive 440-page document is a single, understated line. “The CVN 79 [USS John F. Kennedy] delivery date shifted from July 2025 to March 2027 (preliminary acceptance TBD) to support completion of Advanced Arresting Gear (AAG) certification and continued Advanced Weapons Elevator (AWE) work.”

在這份長達440頁的文件中,只有一行不起眼的文字:CVN 79(「約翰·F·甘迺迪」號)的交付日期已從2025年7月調整為2027年3月(初步驗收日期待定),以支持先進阻攔裝置(AAG)認證的完成以及先進武器升降機(AWE)的持續研發工作。”

During a House Armed Services Committee hearing last month, the Secretary of the Navy acknowledged that many of the U.S. Navy’s shipbuilding programs are behind schedule and out of sorts, though he expressed his hope that the Navy would be able to resolve a lengthy list of problems in the future.
在上個月的眾議院軍事委員會聽證會上,海軍部長承認美國海軍的許多造船項目都進度滯後且混亂不堪,但他表示希望海軍未來能解決一系列問題。

“All of our programs are a mess, to be honest,” said John C. Phelan, the Navy secretary. “We are behind schedule, over budget,” Phelan said. He added that “our best-performing one [program] is six months late and 57% over budget… So, we are working very hard to get these fixed. The Navy has begun to make some rapid changes at the public shipyards, and we’ve been talking with Electric Boat and Huntington Ingalls [HII].”
「坦白說,我們所有的項目都一團糟,」海軍部長約翰•C•費蘭說。 「我們進度落後,預算超支,」費蘭補充道。他補充說:“我們表現最好的項目也延期了六個月,預算超支了57%……所以,我們正在努力解決這些問題。海軍已經開始對公共造船廠進行一些快速改革,我們也一直在與通用動力電船公司和亨廷頓•英格爾斯公司(HII)進行磋商。”

MORE PROBLEMS FOR THE NAVY
海軍面臨更多問題
The USS John F. Kennedy is the second of four planned Gerald R. Ford-class aircraft carriers. The lead ship of the class, the USS Gerald R. Ford, was delivered to the U.S. Navy 32 months, or over 2.5 years, behind schedule. The carrier’s elevators, which shuttle weapons and planes through the ship to the top, were nonfunctional at the time of delivery and required several years to repair.
「約翰•F•甘迺迪」號航空母艦是計畫建造的四艘「傑拉爾德•R•福特」級航空母艦中的第二艘。該級首艦「傑拉爾德•R•福特號」交付美國海軍的時間比原計畫晚了32個月,也就是超過兩年半。該航空母艦的升降機(用於將武器和飛機從艦體運送到頂部)在交付時無法正常工作,維修耗時數年。

Phelan was joined by Acting Chief of Naval Operations James W. Kilby and General Eric M. Smith, commandant of the Marine Corps. The hearing can be seen, in its entirety, here.
海軍部長費蘭與代理海軍作戰部長詹姆斯•W•基爾比和海軍陸戰隊司令埃里克•M•史密斯將軍一同出席了聽證會。聽證會的完整影片可在此處觀看。

Besides the problems experienced by the first two aircraft carriers of the Gerald R. Ford-class, the Secretary also explained that the Virginia-class submarines and the Columbia-class ballistic-missile submarines are also both behind schedule.
除了「傑拉爾德•R•福特」級前兩艘航空母艦遇到的問題外,部長還解釋說,「維吉尼亞」級潛艦和「哥倫比亞」級彈道飛彈潛艦的建造進度也都已落後於計畫。

Not only that, but the costs of the Constellation-class frigates are increasing, and some of the upcoming Arleigh Burke-class guided-missile destroyers are falling behind schedule. Some of the U.S. Marine Corps’ amphibious warfare ships are also in poor condition.
不僅如此,星座級護衛艦的成本還在不斷上漲,一些即將下水的阿利•伯克級飛彈驅逐艦的建造進度也落後於計畫。美國海軍陸戰隊的一些兩棲作戰艦艇狀況也不佳。

“The United States Navy and Marine Corps are prepared and ready to fight and win, anytime and anywhere,” Navy Secretary Phelan said. “However, our naval superiority is under threat. For too long we have allowed our shipbuilding industry to erode, hollowing out the very capacity we need to maintain credible naval deterrence. That must change.”
「美國海軍和海軍陸戰隊隨時準備在任何時間、任何地點作戰並取得勝利,」海軍部長費蘭表示。 「然而,我們的海上優勢正受到威脅。長期以來,我們放任造船業衰落,削弱了我們維持可靠海軍威懾所需的能力。這種情況必須改變。”

A spokesman for Huntington Ingalls told Bloomberg that HII is “addressing first-of-class production and supply base challenges impacting submarine and aircraft carrier programs,” and that some of the mistakes made in building the USS Gerald R. Ford had been identified and would be fixed. However, he acknowledged that those lessons couldn’t be applied to the USS John F. Kennedy, as that ship was already in a very advanced stage of construction.
亨廷頓•英格爾斯造船廠的發言人告訴彭博社,該公司正在“解決影響潛艇和航空母艦項目的首艦生產和供應基地方面的挑戰”,並表示“杰拉爾德•R•福特”號航母建造過程中出現的一些錯誤已被發現,並將予以糾正。然而,他承認這些經驗教訓無法直接應用於「約翰•F•甘迺迪」號航空母艦,因為該艦當時已處於建造的後期階段。

Whether the anticipated March 2027 delivery date can be adhered to remains to be seen. Another question is whether the lessons learned from building the USS Gerald R. Ford and the USS John F. Kennedy can be applied to the latter two Ford-class carriers in time.
能否如預期在2027年3月交付仍有待觀察。另一個問題是,從「傑拉爾德•R•福特」號和「約翰•F•甘迺迪號」的建造過程中汲取的經驗教訓能否及時應用於後兩艘福特級航空母艦的建造。
2026-06-05 11:11 發佈
CVN79在2027年说不定会大哥福特号一样来个强行交付。
没完成交付前应有的全部科目不要紧,交付这个形式本身更重要。
毕竟国会还有11艘下限的法律条文摆在那里。

当初CVN78在2017年就匆匆宣布入役,
一堆入役前本应完成的测试科目全都放到之后进行。
以至于入役后第6年的2023年才迎来第一次真正的海外任务部署。

已经部分变成CVN78器官提供者的CVN79再来一次这样的过程也不是没可能。
chrischenslayer wrote:哥偶然從外網找到這份...(恕刪)

全球化資本主張萬事可外包.

10幾年前航母的蒸氣彈射公司B&W在美國聲請破產. 但北京分公司還在

美軍考慮把航母建造外包給大陸嗎?

大陸當年發展彈射有兩支團隊. 一隻電磁彈射一隻備分搞蒸氣彈射

蒸氣彈射那支團隊應該很樂意接美國海軍的訂單
那天西奈山頂是Enki wrote:
10幾年前航母的蒸氣彈射公司B&W在美國聲請破產. 但北京分公司還在
美軍考慮把航母建造外包給大陸嗎?

這消息有誤區網路上一直流傳「巴布科
克-威爾科克斯公司」(B&W)倒閉!正確
說是蒸氣彈射相關業務部門收起來.人家
B&W有更硬核項目持續蓬勃發展~軍用
核反應堆.

B&W蒸氣彈射部門最活耀輝煌年代是美
海軍企業級和尼米茲級航母使用蒸氣彈射
器C-13.B&W主導蒸氣彈射項目總組裝.

美海軍電磁彈射可行性研究早於1990年,
正式立項1999年簽訂合約在2009年.新一
代福特級航母確定採用電磁彈射.娘不疼
導致原本蒸氣彈射器供應商持續凋零.

對蒸汽彈射器有影響是後勤與維修~技術
門檻高且市場需求少導致相關團隊嚴重萎
縮.注意沒零件缺少問題(多數料件已提前
入庫),施工團隊匱乏導致進乾船塢後工期
一直延後~God bless美國海軍!
mangchaocs wrote:
CVN79在2027年说不定会大哥福特号一样来个强行交付。
没完成交付前应有的全部科目不要紧,交付这个形式本身更重要。

2026年中開始驗收海試(Acceptance
Trials),目前還在紐波特紐斯造船廠.
通過後才會有2027年3月交付海軍.

軍事迷喜聞樂見CVN79電磁彈射F-35C
重頭戲還要等到交付海軍後.
福特號航母燒毀嚴重,不知道整修完成了沒?

軍方粉飾?CNN 曝福特號火災真實慘況 水兵:「拚命滅火或等死」



bbvvccjojotv wrote:
福特號航母燒毀嚴重,不知道整修完成了沒?

軍方粉飾?CNN 曝福特號火災真實慘況 水兵:「拚命滅火或等死」

福特號火災新聞來源是CNN,報導最底下透漏維修時間至少需要一年.(沒法插隊維修就得排隊等)
Exclusive: Video reveals damage from fire on US aircraft carrier after sources say fire control system failed

The Ford is now looking at an extended phase of maintenance from all of the wear-and-tear of the voyage, including additional repairs related to the fire. One US official told CNN it could be a least a year before the Ford is ready to sail again, and that other ships may have to fill the gap.
問題暴露出來才能改善,那像中國⋯事事都掩著蓋著,主事者紛紛被抓起來了還不公佈實際情況!看來若中國再次爆發戰爭的話⋯甲午戰爭時在艦船上手搓砲彈的情況又要再次上演了
shaupenhauer456

你美爹已經上演”手搓炮彈“了!無論是福特艦還是核潛艇、兩栖攻擊艦,還沒開打,你美爹家已經損失了好几艘了![笑到噴淚][笑到噴淚]

2026-06-08 11:32
2026年3月12日,美國海軍傑拉爾德· R·福特號航空母艦在紅海執行任務時突發火災,美國CNN在6月發佈的最新調查報導通過新畫面和照片披露,此次火災的嚴重程度遠超過美國海軍最初的官方聲明。

火災核心細節

起火位置與燃燒時長 :火災起源於艦上的洗衣房區域,艦員耗時約 30小時 才徹底撲滅大火並防止複燃。
關鍵系統失靈 :航母配備的先進自動滅火系統完全未能正常啟動,最終只能由數百名水兵手動滅火,這也導致火勢進一步蔓延。
受損情況 :火災燒穿了三層甲板,水兵居住區大量床鋪被徹底燒毀,僅殘留焦黑扭曲的金屬框架,天花板被燒穿,地面遍佈灰燼; 約 600名水兵 失去原有住宿空間,只能臨時在地板、桌面休息,另有約200名水兵因吸入煙霧接受治療。











美國官方初期通報 :美國海軍中央司令部當時稱火勢已“得到控制”,兩名水手受“非致命傷”,並宣稱航母“完全可正常作戰”,起火與戰事無關。

最新曝光事實 :CNN獲得的內部視頻顯示,火災實際持續了約 30小時 才撲滅,損毀程度極高,且艦上自動消防系統未能正常工作。




火災燒穿了三層甲板幾乎成廢墟...自動滅火系統完全未能正常啟動..
warrenwang111 wrote:2026年3月12日...(恕刪)

其實不太明白為何要取名為福特號.....

因為歷史上福特總統滿衰的. 他就是因為尼克森水門案被推上總統之位

我記得他在任內被股民刺殺好幾次.

因為當時美元放棄金本位. 布雷頓森林協議崩潰的苦果基本是他在承擔

最後他選輸給吉米卡特. 後面的卡特也很衰. 卡特不想打仗想美國好好休生養息

但選民認為卡特很魯不敢全世界搶搶搶.

卡特後面民主黨基本長時間無法執政. 民主黨下一位克林頓已經是90年代了...

老美不信五行八卦姓名學 ???