http://www.caf.es/en/productos-servicios/proyectos/proyecto-detalle.php?p=263
KAOHSIUNG LRV
In 2013, the Mass Rapid Transit Bureau of the Kaohsiung City (KMRT) and the consortium made by Evergreen Construction Corp. and CAF have signed the contract to build the first phase of the circular LRV line of the Kaohsiung city. This new line will be built in 2 phases with a total length of 30 kms. The Kaohsiung seaport city is the second largest city in Taiwan.
This is a turn-key project in which CAF supplies the rolling stock, signalling, electrification, the ticketing system and the integration of all subsystems. This scope is covered with the participation of the companies CAF Signalling and CAF Transport & Engineering, both part of the CAF Group.
Technical data sheet:
1.Composition Mc-S-T-S-Mc
2.Train length (mm): 34.166
3.Total passenger capacity 250
4.Maximum speed (km/h) 70
5.Equipment
(1)Cab air conditioning
(2)Passenger saloon air conditioning
(3)Audio and visual information for passengers
(4)Events recorder (black box)
(5)Control and supervision system
(6)Video surveillance
(7)ATP
(8)Radio
(9)Fire detection system
(10)ACR
有興趣的人可以互相研究討論一下
X




























































































